text.skipToContent text.skipToNavigation
 

Danfoss - Optimize your HVAC with 3D Building Information Modeling files 


Save time and reduce risk 

Design your system faster with access to valuable drive information including 3D Building Information Modeling (BIM) files for VLT® HVAC Drive FC 102. You can fully document your installation in AutoCAD Revit, to reduce the risk of errors, and save time on system design. 

The 3D BIM files of building components enable architects and engineers to create highly accurate visualizations of a final solution. In the design stage, these visualizations help to reduce design iterations and minimize risk. They do this by facilitating checks for adequate space for components, wiring, and piping in a building or ship. 


Transparency from cradle to grave 

In the operational phase, the BIM files also facilitate lifecycle optimization, providing documentation of important component information, from factory to end of life. They enable construction companies to provide adequate documentation in the handover from contractor to owner, for lifetime building maintenance purposes. 

For easier access to data in the form of PDF and Excel files, drawing and product data are split into separate documents. These highly accessible formats make it easier to find required data when ensuring compliance with global standards. It also reduces the 3D file size that the AutoCAD system has to manage and provides the opportunity to comply with the different BIM standards globally. 

You can access all the BIM files for FC 102 drives in the 3D models and drawings library. Use the filter for BIM files for quick access. 

You can also search in MagiCAD Cloud for FC 102 BIM files. 


Your advantages: 

  • Easy integration of FC 102 drives into Building Information Modeling (BIM) systems for lifecycle traceability 

  • Design your system faster with access to important drives information including 3D BIM files. Run fewer design iterations. Easier engineering saves you time and reduces the risk of errors. 

  • BIM information is split into detailed product information and 3D drawing with main drive information. This is done to optimize AutoCAD operation time and 3D storage capacity as well as comply with the different BIM standards globally to add required drive information. 

 
 

Stay up to date with the latest news:

  • NEWS
    4 apr. 2025
    News - Siemens - SIRIUS 8WD46 signal column
    High system availability and efficient engineering with this flexible signal column. Each segment individually configurable. Siemens has further expanded its portfolio of SIRIUS 8WD4 signal columns with a new high-performance signal column, which is electronically configurable as standard. Making it particularly easy to adapt to individual application requirements.
    Read more
  • NEWS
    3 apr. 2025
    ABB - Machine safety in 3 steps
    Machine safety is a crucial aspect in the industrial sector, where ensuring the safety of both the machine and the user is paramount.  Monitor, control and connect - in three steps to maximum safety and production efficiency.   
    Read more
  • NEWS
    31 mrt. 2025
    Deep dive Smart Supply about itsme
    The recent expansion of itsme Group has been noted by the creators of Smart Supply, a US podcast about the tech wholesale industry. Their ‘deep dive’ on itsme was published this week.
    Read more
  • NEWS
    28 mrt. 2025
    Phoenix Contact - HEAVYCON Click-in Contactblokken
    HEAVYCON Click-in contact blocks for heavy-duty connectors increase efficiency during cabling. Where previously screws were used, now they are simply plugged in. Push-in Technology and Click-in locking ensure very easy handling and safe installation. You no longer need any tools for connecting the wires or mounting the contact block in the connector housing.
    Read more

Check out our other success stories:

  • TESTIMONIAL
    2 apr. 2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more
  • TESTIMONIAL
    19 feb. 2025
    Peeters - Young Company, New Equipment
    Since its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
    Read more
  • TESTIMONIAL
    26 dec. 2024
    Kusters - Putting weight behind it
    Kusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
    Read more
  • TESTIMONIAL
    22 nov. 2024
    Eneco - Green light for green electricity and steam
    Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
    Read more

Why not take a look at these trainings we offer: